National Repository of Grey Literature 24 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Pool in Litomyšl - conctruction technological project
Mužátko, Pavel ; Novotný, Michal (referee) ; Biely, Boris (advisor)
The technological projeckt of building deals witch indoor swimming pool in Litomyšl. This Mastr's includes technical reports site equipment and STP, technological regulation, calculation, budget, inspection and test plan, wider transport relations, mechanical assembly for tis building.
Execution of Superstructure of Training Centre in Náchod
Nováková, Martina ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The bachelor thesis deals with the implementation of the rough construction of the training center. The work includes the accompanying and summary technical report, the broader transport relations and the principles of the organization of the production for the given stage, the technological regulation for the vertical supporting structures, the control and test plan for the vertical supporting structures, the technological regulation for the horizontal supporting structures, the control and test plan for the horizontal supporting structures , Machine assembly for the given stage and safety and health protection at work. The annex parts of the thesis are coordinating situation, site equipment, timetable for realization of rough construction, laying plan of Spiroll track panels, KMB Sendwix masonry scheme, formwork scheme.
Football grounds Vrchlabi - rough upper construction
Vochyán, David ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of this bachetor's thesis is to describe constructien- technological stage of rough upper construction of some part of grandstand in Vrchlabí. It consist of a possible solution of supply of steel segments and its delivery to building from site stock, project of equipment of building site, technological regulation for assembly of steel construction, machine configuration , control od worte quality, time schedule and building budget.
Modernization of the complex Vienna Point 3, Brno - gross superstructure
Knotek, Vít ; Liška, Pavel (referee) ; Biely, Boris (advisor)
This bachelor's thesis aims to clearly describe the building technology stage of gross superstructure hall Vienna Point 3 within the modernization of the entire premises of the company. The content of this bachelor thesis is to address supply parts for assembly and its transport from the processing plant to the designate place of hall Vienna Point 3. Furthermore, the equipment of construction zone, efficient technologies, quality control of work, schedule of work and the construction budget. My aim was to design a progress of work in order to take maximum advantage of the steel skeleton, especially the speed of construction.
Preparation for realization of reinforced concrete storage hall in Polička
Zelinková, Marta ; Kratochvílová, Erika (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
Extension of storage hall in Jirice - gross superstructure
Jůzl, Martin ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of the thesis is structural and technological solutions gross superstructure Object Extension to production and storage hall in Jiřice. The solution is dependent on the choice of the technological process of installation of steel structures, which will be addressed from a financial and timing perspective. Workflow will be affected by mechanical assembly, wider transport links and facilities construction site.
PFM Flexi storage hall - construction technology project
Chroustovský, David ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
ZOO garden Brno, Refreshment structure - rough construction
Černohorská, Magda ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
aim of this bachelor thesis is the building-technological solutions of Zoo garden Brno, refreshment structure – rough construction. Part of the thesis is technical report the work site facilities, transport links, reports the machine design, schedule and budget, technical report the work site facilities, problem details, monitoring and test plans, protection of healt and environmental.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Apartment building Bílá hora - gross substructure
Michalčíková, Lucie ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this bachelor thesis is the building-technological solutions of gross substructure to apartment building Bílá hora. Part of the thesis is technical report the work site facilities, technical regulation of selected works, monitoring and test plans, reports the machine design with associated transport links, plan of safety and protection of health, environmental, budget and schedule.

National Repository of Grey Literature : 24 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.